Risks of TBM Construction and Corresponding Measures

Article Preview

Abstract:

To get better understanding of TBM construction risk and avoid it, comprehensive analysis and summary of various factors to TBM construction risk were made in three aspects, such as geological and hydrological conditions, TBM equipment, construction team of TBM. Based on the detailed presentation of hydrological conditions, the corresponding demands of TBM equipment and construction team were put forward. Emphatically from the two aspects of bad geological and countermeasures, design of TBM equipment, corresponding strategies to avoid all kinds of risk were proposed. Using Taiwan Hsuehshan Tunnel as the class project, this paper introduced and analyzed the construction risk and of solutions to it, with the hoping of providing guidance for TBM design, risk analysis and evade of construction and other aspects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1370-1378

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] ZHOU Zhiqing, ZHONG Xianqi, SONG Jinliang, et al. Risk Analysis and Risk Control Technology for Shield Tunneling in Guangzhou Region[J]. Tunnel Construction, 2010(5): 608-611.

Google Scholar

[2] PAN Xuezheng, CHEN Guoqiang, PENG Min. Risk Assessment on Shield Excavation in Very Large Tunnel Across Qiantang River[J]. Chinese Journal of Underground Space and Engineering, 2007(S1): 1245-1254.

Google Scholar

[3] MA Yunkang. Analysis on and Control of Risks in Shield Boring Underneath Buildings[J]. Tunnel Construction, 2011(3): 391-395.

Google Scholar

[4] CUI Jiujiang. Risks and Countermeasures for Construction of Shield-bored Tunnels[J]. Tunnel Construction, 2009(4): 377-396.

Google Scholar

[5] HUANG Peizhi. Risk Analysis Theory of Diversion Tunnel TBM Construction and Its Application[D], 2009, TianJin University.

Google Scholar

[6] WEN Sen, XU Weiya. RISK ANALYSIS OF DOUBLE SHIELD TBM CONSTRUCTION ACCIDENT INDUCED BY TUNNEL DEFORMATION[J]. Chinese Journal of Rock Mechanics and Engineering, 2011(S1): 3060-3065.

Google Scholar

[7] XU Run-ze, SONG Tian-tian. Practice of Risk Identification and Assessment of Shield Tunnelling in Chengdu Metro[J]. Tunnel Construction, 2007(6): 98-100+104.

Google Scholar

[8] Tang Zhilin, YANG Jinghui, YANG Shujun. Construction Risk Assessment on the TBM-3 Construction Section of Dahuofang Water Conveyance Project[J]. Water Power, 2006(7): 39-41.

Google Scholar

[9] Sun Jidong. Pre-arranged Planning for the Talent Risks with TBM Construction in Jinping Water-diversion Long Tunnel[J]. Railway Construction Technology, 2007(6): 31-33+48.

Google Scholar

[10] HOU BINGjun, YU Zhengxin, Liu Jinwei. Potential risk of TBM construction in long tunnel and countermeasures[J]. Water Resources & Hydropower of Northeast China, 2007(11): 19-20+39.

Google Scholar

[11] WEN Sen, XU Wei-ya. Risk Analysis on TBM Jamming in Deep Buried Tunnel[J]. Journal of Yangtze River Scientific Research Institute, 2008(5): 135-138.

Google Scholar

[12] ZHAO Yan-xi, XU Wei-ya. Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation[J]. Rock and Soil Mechanics, 2009(3): 793-798.

Google Scholar

[13] WANG Ruifen, CHEN Zhu, YANG Xiaoying. Simple analysis on risk management of TBM construction in one derivation tunnel[J]. Project Management Technology, 2010(9): 32-35.

Google Scholar