Model Test Study on a Large-Section Cable Tunnel

Article Preview

Abstract:

The profile layout rationality and internal stress structure of a large-section cable tunnel and a cable-laying scheme at splicing locations were studied through full-scale model test. The full scale shield tunnel which the diameter was 6m was built on the ground. The model tests test the displacement of cable bearers, the coupling area between horizontal beam and steel ring, the coupling area between horizontal beam and steel pillar, edge beam and center beam under design loads, and the safety and reliability of an arc steel framing system that supports the cable load inside the cable tunnel during the operation stage were demonstrated. The cable-laying schemes for the cross section and straight-through-type and T-type couplings of a large-section cable tunnel were optimized through experiment on actually laid-out cables. For the section layout of a large-section cable tunnel, it is believed that the double-deck scheme prevails over the single-deck scheme, and such a cable-splicing scheme can meet the cable-laying requirement.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1411-1416

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Morgan Sindall Group plc, 2011. Croydon Cable Tunnel Beddington to Rowdown, Greater London, Morgan Sindall Group plc, London, UK.

DOI: 10.1093/ww/9780199540884.013.u245113

Google Scholar

[2] Karakitsiou, M.; Bowler, R.; Sadler, S.; Pepper, S., 2007. Outline design and construction of the 10 km (6. 25 mile) Croydon cable (high voltage) tunnel through Groundwater Source Protection Zones, United Kingdom. Rapid Excavation And Tunneling Conference, Toronto, ON, Canada, pp.117-136.

Google Scholar

[3] Ausgrid, 2011. City East Cable Tunnel, Ausgrid, Sydney, Australia.

Google Scholar

[4] Ashley, J.J., 2008. Design and construction of the City West cable tunnel, Sydney Australia. 13th Australian Tunnelling Conference, Melbourne, VIC, Australia, pp.7-19.

Google Scholar

[5] Drowley, L.; Kuras, A., 2008. Design of a steel fibre reinforced concrete segmental tunnel Lining - City west cable tunnel project, Sydney. 13th Australian Tunnelling Conference, Melbourne, VIC, Australia, pp.471-478.

Google Scholar

[6] Woodrow, S., 2008. Lower Lea Valley Cable Tunnels - A case study of a program critical project. 13th Australian Tunnelling Conference, Melbourne, VIC, Australia, pp.273-277.

Google Scholar

[7] Mainwaring, G.D., Lam, Y.K., 2001. The planning, design and construction of the TUCAS Cable Tunnel and future power transmission cable tunnels in Singapore. Rapid Excavation and Tunneling (RETC) Conference, San Diego, USA, pp.647-658.

Google Scholar

[8] Dragages Hong Kong Limited, 2007. Castle Peak Cable Tunnel, Dragages Hong Kong Limited, Hongkong, China.

Google Scholar