Analysis on Ground Settlement Induced by Shallow Buried Cross Channel of CRD Method under Artificial Filling

Article Preview

Abstract:

The shallow underground tunnel is near to the ground; its many construction procedures are complicated, supporting and excavation are intertwined. The ground surface deformation is complex during construction. Through the analysis of the cross passage surface settlement data of Dalian metro Line 1High-tech zone Street station, we found that the ground surface caused by artificial filling integrally sinks during excavation, the shape of its sinking is like a flat funnel, the characteristics of settling tank are obvious. The influence of faces constructing is obvious on surface settlement, and the transverse influence range is about 30m; the longitudinal influence range is about 15m. The results of the paper show that the place of monitoring points should be held at 15m ahead from the tunnel face, effectivemonitoring period is 70d. The monitoring results are enough and safe for the stability requirement of the surrounding rock.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1519-1524

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ting Wang, Weining Liu, Furong Luo, and Xinggao Li. Study on Surface Settlements Induced by Bored Shallow Tunneling of Subway, URBAN RAPID RAIL TRANSIT, 2009, 22(6). (In Chinese).

Google Scholar

[2] Bo Wu, Bo Gao. Study of Ground Subsidence Induced by Urban Subway Tunneling under Complicated Conditions, Southwest University, 2006, 27 (6). (In Chinese).

Google Scholar

[3] Peck R. B, Deep excavation sand tunneling in soft ground, State of the Art RePort. Proe. 7th Int . Conf. on soil Mechanics and Foundation Engineering, Mexico City, 1969, 225-290.

Google Scholar