Tunnel Karst Disease Risk Estimation by Advance Geological Forecast

Article Preview

Abstract:

The concept of "tunnel karst disease risk estimation" is put forward for the first time, which is applied in advance geological forecast of Shajinjie tunnel. This method can help us recognizing the main hole advanced prediction work to improve the forecast work pertinence. In the forecast method, it takes the head in integrating the surface high-density electrical method with the georadar method, which improves the forecast accuracy of serious karst disease. The actual excavation results show that the advance geological forecast results meet the actual situation highly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1689-1692

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Guo Liu, Zhuojun Li, Weidong Shen, et al. Integrated Advance Geologic Prediction Applied in Changleshan Tunnel[J]. Chinese Journal of Modern Tunnelling Technology, 2011, 48(1): 123-127. In Chinese.

Google Scholar

[2] Gang Wang, Zhaoshuai Yang. Application of Integrated Tunnel Geological Prediction Technologies to Highway Tunnels[J].  Modern Tunnelling Technology, 2012, 49(1): 160-165. In Chinese.

Google Scholar

[3] Jianyong Xia. Application of Advance Geological Forecast and Construction Control Technology[J]. Journal of China & Foreign Highway, 2010, 30(5): 241-243. In Chinese.

Google Scholar

[4] Zeng Chang. Application of Geological Radar to Advance Geological Forecast in Karst Area[J]. Journal of China & Foreign Highway, 2010, 30(2): 185-187. In Chinese.

Google Scholar

[5] Xiongjun Huang. Geological Forecast for Cavity at +978 of Malujing Tunnel on Yichang-Wanzhou Railway[J]. Modern Tunnelling Technology, 2011, 48(1): 128-132. In Chinese.

Google Scholar

[6] Ying Ye. Advance Geological Forecast Method Research of Karst Tunnel Construction[D]. Beijing Jiaotong University, 2006. In Chinese.

Google Scholar

[7] Ying Ye. Tunnel Synthetical Parameter Method Geological Prediction Technique Research[J]. Geology and Prospecting, 2009, 45(4): 468-473. In Chinese.

Google Scholar

[8] Gengren Cao, Shuping Jiang, Xiumei Tan, Yonggang Peng. Application of Geological Radar and TGP206 to Advance Geological Forecast of Shenyang Tunnel[J]. Highway Transportation Science and Technology, 2012, (12): 107-113+124. In Chinese.

Google Scholar

[9] Zhanfeng Fan, Tianbin Li, Lubo Meng, Zhifa Zeng, et al. Application of Geological Radar in Highway Tunnel [J]. HIGHWAY, 2010, (2): 209-213. In Chinese.

Google Scholar

[10] Weihai Guo, Caikui Lin, Jianqin Fang. Adaptability Research of Typical Advanced Geological Forecast Method[J]. HIGHWAY, 2010, (6): 234-237. In Chinese.

Google Scholar