[1]
Guo Liu, Zhuojun Li, Weidong Shen, et al. Integrated Advance Geologic Prediction Applied in Changleshan Tunnel[J]. Chinese Journal of Modern Tunnelling Technology, 2011, 48(1): 123-127. In Chinese.
Google Scholar
[2]
Gang Wang, Zhaoshuai Yang. Application of Integrated Tunnel Geological Prediction Technologies to Highway Tunnels[J]. Modern Tunnelling Technology, 2012, 49(1): 160-165. In Chinese.
Google Scholar
[3]
Jianyong Xia. Application of Advance Geological Forecast and Construction Control Technology[J]. Journal of China & Foreign Highway, 2010, 30(5): 241-243. In Chinese.
Google Scholar
[4]
Zeng Chang. Application of Geological Radar to Advance Geological Forecast in Karst Area[J]. Journal of China & Foreign Highway, 2010, 30(2): 185-187. In Chinese.
Google Scholar
[5]
Xiongjun Huang. Geological Forecast for Cavity at +978 of Malujing Tunnel on Yichang-Wanzhou Railway[J]. Modern Tunnelling Technology, 2011, 48(1): 128-132. In Chinese.
Google Scholar
[6]
Ying Ye. Advance Geological Forecast Method Research of Karst Tunnel Construction[D]. Beijing Jiaotong University, 2006. In Chinese.
Google Scholar
[7]
Ying Ye. Tunnel Synthetical Parameter Method Geological Prediction Technique Research[J]. Geology and Prospecting, 2009, 45(4): 468-473. In Chinese.
Google Scholar
[8]
Gengren Cao, Shuping Jiang, Xiumei Tan, Yonggang Peng. Application of Geological Radar and TGP206 to Advance Geological Forecast of Shenyang Tunnel[J]. Highway Transportation Science and Technology, 2012, (12): 107-113+124. In Chinese.
Google Scholar
[9]
Zhanfeng Fan, Tianbin Li, Lubo Meng, Zhifa Zeng, et al. Application of Geological Radar in Highway Tunnel [J]. HIGHWAY, 2010, (2): 209-213. In Chinese.
Google Scholar
[10]
Weihai Guo, Caikui Lin, Jianqin Fang. Adaptability Research of Typical Advanced Geological Forecast Method[J]. HIGHWAY, 2010, (6): 234-237. In Chinese.
Google Scholar