3D Simulation of Mechanised Excavation in Brittle Rock

Article Preview

Abstract:

During the excavation by TBM of the Aicha Exploratory Tunnel along the Brenner Base Tunnel in Italy, in hard brittle granitic rocks, an instability phenomenon occurred at chainage 6+151. The left-hand sidewall lining partially collapsed for a length of approximately 60m. This led to a stoppage of the TBM lasting about 4 months. With the reconstruction of the geological model, a sub-vertical fault, not forecast at the design stage, was identified parallel to the direction of the excavation. In this paper, a three-dimensional (3D) model, which simulates the complex interaction between the rock mass, the TBM and its system components, and the tunnel support, is presented. The model accounts for the main machine components: shields, cutterhead, grippers, pea gravel and lining. The brittle failure of a thin granite diaphragm between the fault zone and the tunnel wall is reproduced and the results are discussed in terms of failure zone and horizontal displacements.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1724-1731

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Barla G, Ceriani S, Fasanella M, Lombardi A, Malucelli G, Martinotti G, Oliva F, Perello P, Pizzarotti E M, Polazzo F, Rabagliati U, Skuk S, Zurlo R, 2010. Problemi di stabilità al fronte durante lo scavo del cunicolo esplorativo Aica-Mules della Galleria di Base del Brennero. MIR 2010, Torino.

Google Scholar

[2] Barla G, Janutolo M, Zhao K, 2011. Open issues in Tunnel Boring Machine excavation of deep tunnels. Keynote Lecture. 14th Australasian Tunnelling Conference. Auckland, New Zealand.

Google Scholar

[3] Diederichs M S, 2007. The 2003 Canadian Geotechnical Colloquium: Mechanistic interpretation and practical application of damage and spalling prediction criteria for deep tunneling. Can Geot J, 44, 1082-1116.

DOI: 10.1139/t07-033

Google Scholar

[4] Grandori R, Beniawski Z T, Vizzino D, Lizzadro L, Romualdi P, Busillo A, 2011. Hard rock extreme conditions in the first 10 km of TBM driven Brenner Exploratory Tunnel. Proc. of Rapid excavation & Tunnelling Conference 2011, San Francisco, USA.

Google Scholar

[5] Vermeer P A, De Borst R, 1984. Non-associated plasticity for soils, concrete and rock. Heron, 29, 1-64.

Google Scholar

[6] Zhao K, Janutolo M, Barla G, 2011. A completely 3D model for the simulation of mechanized tunnel excavation. Rock Mechanics and Rock Engineering, 2012, 45 (4): 475-497.

DOI: 10.1007/s00603-012-0224-3

Google Scholar