Study on Flood Control Pre-Discharge Dispatching Scheme of Reservoir Based on Fuzzy Optimum Selection
Abstract:
Flood control dispatching of reservoir belongs to the ex-ante decision. This paper established the flood pre-discharge dispatching multi-objective risk index system and fuzzy optimization model method, taking Long Men reservoir as an example, to study the design flood pre-discharge scheme for different frequency, different frequency analysis of design flood pre-discharge flow and pre-discharge time, provide the reservoir flood pre-discharge scheme of different frequency flood and provide reliable basis for reservoir flood control pre-discharge dispatching.
Info:
Periodical:
Pages:
2641-2644
Citation:
Online since:
August 2013