In order to analyze reliability for strength of pre-stressed pipe pile welded joints in common construction activities, perform checking calculation to welded joint strength in various construction activities with the weld check formula in consideration of the influence coefficient of the eccentrically loaded end plate, compare with the shear strength of the pipe pile end plate porthole and the tensile strength of the steel bar pier head, and analyze from overall safety of pipe pile application before obtain the conclusion: the strength of the weld joint made according to relative codes is far more than the strength of the weak part of the pipe pile, but some severe weld defects will make weld joint become the first part to be damaged. One recommendation is increase the joint strength between the anchorage hole of the pipe pile end plate and the pre-stressed steel bar pier head; the other is to make the new welding construction specifications for pipe pile joint, improve requirements to joint welding construction, reduce welding duration, reduce working strength and improve welding quality stability.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2831-2835

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] 03SG409 Pre-stressed Concrete Pipe Pile[S].

Google Scholar

[2] Technical Regulations for Pre-stressed Concrete Pipe Pile Foundation[S].

Google Scholar

[3] DB33/1016-2004 Technical Regulations for Pre-tensioning Method of Pre-stressed Concrete Pipe Pile Foundation of Zhejiang[S].

Google Scholar

[4] DBJ14-010-2006 Technical Regulations for Pre-stressed Concrete Pipe Pile Foundation of Shandong[S].

Google Scholar

[5] DBJ13-86-2007 Technical Regulations for Pre-tensioning Method of Pre-stressed Concrete Pipe Pile Foundation of Fujian[S].

Google Scholar

[6] Hou Shengnan, Liu Shannan and Huang Shaoming, , Brief Talk about Checking Calculation of Pile Structural Strength for Pre-stressed Pipe Pile as Uplift Pile [J] Chinese Journal of Geotechnical Engineering,2010, 8(32): 294-297.

Google Scholar

[7] Li Weixing, Wan Yuerong and Liu Qingbin, Design and Experimental Study on A New Connection between PHC Uplift Pile Segments of the Expo Theme Pavilion, Journal of Building Structures,2010, 5(31): 83-94.

Google Scholar

[8] Chen Daijie, Fan Xiangyang and Xu Feng, Study on Pre-stressed High Concrete Pile as Resistant Extraction Pile in Shanghai [J] Building Structure, 2007, 4: 146-149.

Google Scholar

[9] Construction Regulations for Pre-stressed Centrifugal Concrete Pipe Pile with the Pre-tensioning Method [S].

Google Scholar