Analysis and Treatment of Landslide at the Tunnel Portal in Nanjing Road

Article Preview

Abstract:

The landslide at the tunnel portal in Nanjing Road is mainly determined by a weak intercalated layer between the completely weathered bedrock and the strongly weathered bedrock. The weak intercalated layer has low permeability and weak shear strength, and its interface dip outside of the slope. As the consequence, landslide is likely to happen again due to a rainstorm or other inducement. In order to prevent a second landslide, a comprehensive treatment scheme is presented, which implements anti-slide piles as the major treatment and several auxiliary treatments including filling and compacting the cracks, cutting-off and draining water, locally bolt-shotcrete support, and repairing the existing retaining wall and the lattic frame beams. After applying this scheme, the slope stability meets the design requirements.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

686-691

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Industry standard of Geology and Mineral of the People's Republic of China: Specification of Design and Construction for Landslide Stabilization. Standards Press of China, China 2006 (In Chinese).

Google Scholar

[2] Qihua Zhao, Sheqin Peng: Retaining and Anchor Engineering for Rock & Soil Mass. Sichuan University Press, China 2008 (In Chinese).

Google Scholar