[1]
Ritesh K, Lyes B(2012). Fuzzy Logic and Interval Arithmetic-Based TOPSIS Method for Multicriteria Reverse Auctions. SERVICE SCIENCE(4): 101–117.
DOI: 10.1287/serv.1120.0009
Google Scholar
[2]
PAN Ke, SHI Jian-yun. Application of Variable Weight Theory and Relative Difference Function to Safety Assess-ment of Urban Subway. s Operation. Journal of the China Railway Society, 2009, 31(3): 20-25.
Google Scholar
[3]
WANG Hong-de, PAN Ke, JIANG Fu-dong. The Preven-tive Countermeasures and Hazards Analysis of Urban Sub-way Operation System Based on the AHP. Journal of the China Railway Society, 2007, 29(2): 27-31.
Google Scholar
[4]
Patrick X. W Zou , Jie L. Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2. Construction Management and Economics, 2010(28): 1219–1238.
DOI: 10.1080/01446193.2010.519781
Google Scholar
[5]
Wei.H. H. Analysis on the Current Situation of Risk Managementon Metro Operation Safety. China Safety Science Journal , 2008( 7): 55-62.
Google Scholar
[6]
Shian-Jong Chuu, Evaluating the flexibility in a manufacturing system using fuzzy multi-attribute group decision-making with multi-granularity linguistic information. Int J Adv Manuf Technol(2007) 32: 409–421.
DOI: 10.1007/s00170-005-0342-0
Google Scholar
[7]
Ding J. F . Critical factors influencing customer value for global shipping carrier-based logistics service providers using Fuzzy AHP approach. African Journal of Business Management Vol. 4(7), pp.1299-1307, 4 July, (2010).
Google Scholar
[8]
Ali Erbasi. The Use of the AHP Method in the Selection of the Most Appropriate Production Materials by Businesses: A Sample Study on Tractor Body Materials. Journal of Advanced Science. Vol. 1, No. 1, March 2013: 152-155.
DOI: 10.12720/joams.1.1.152-155
Google Scholar