p.1227
p.1231
p.1235
p.1239
p.1247
p.1252
p.1259
p.1264
p.1268
Construction Technology of Super-Deep Diaphragm Wall under Complicated Geological and Hydraulic Conditions
Abstract:
Supper-deep diaphragm wall construction of a Tianjin traffic hub project penetrated through many soil layers and two layers of confined water, geological and hydraulic conditions were complicated. Some special technologies including grooving methods,anti-collapse measures,verticality controlling measures, joint treatment measures and steel reinforcement cage hoisting measures were adopted for the construction. The project was finished with short time, low cost and good quality. Engineering practice shows that these technologies were appropriate for constructing supper-deep diaphragm wall under complicated geological and hydraulic conditions. These experiences can give some references to the similar super-deep diaphragm wall construction of Tianjin and other regions in future.
Info:
Periodical:
Pages:
1247-1251
Citation:
Online since:
September 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: