Surface Settlement Time Lag Induced by Shield Tunneling in Urban Sandy-Pebble Stratum

Article Preview

Abstract:

This paper focuses on the surface settlement time lag caused by shield tunneling in sandy-pebble stratum in Chengdu. A surface collapse case during Chengdu metro construction was introduced and the mechanism of surface settlement time lag was analyzed. The process of the ground settlement was simulated using the UDEC software. It is found that: 1) over-excavation and the grouting failure are the root causes of surface settlement; 2) characteristics of the sandy-pebble stratum in Chengdu induce ground voids behind tunnel segmental lining; 3) the mechanism of surface settlement time lag can be explained by temporary ground arch in the sandy-pebble stratum.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1326-1329

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] T.M. Tharp: Engineering geology, Vol. 52 (2) (1999), p.23.

Google Scholar

[2] S.J. Yang: Urban Rapid Rail Transit, Vol. 24 (1) (2011), p.77. (In Chinese).

Google Scholar

[3] Y.X. Bai, T.Y. Qi, Z. R Wu: Journal of Civil, Architectural & Environmental Engineering, Vol. 34 (6) (2012), p.89. (In Chinese).

Google Scholar

[4] X.Y. Li, J. Y, Yan: Chinese Journal of Underground Space and Engineering, Vol. 1(6) (2005). p.965. (In Chinese).

Google Scholar

[5] Y.X. Bai, T.Y. Qi, Z. R Wu, et al: Modern Tunnelling Technology, Vol. 49 (3) (2012), p.54. (In Chinese).

Google Scholar