p.618
p.622
p.626
p.635
p.640
p.644
p.649
p.653
p.657
Processing on Red Mud by Integrated Dealkalized Sintering with Magnetization
Abstract:
Integrated sintering between magnetization and dealkalization, processed on red mud firstly. DWS-50 was used to detect the rate of dealkalization, and phase transition of elemental iron in red mud was analyzed by XRD. By effect of sintering temperature and sintering time on red mud, the results showed that integrated sintering on red mud between dealkalization and magnetization was feasible.
Info:
Periodical:
Pages:
640-643
Citation:
Online since:
September 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: