Research on Construction Supervision Progress Control during Equipment Installation Phase

Article Preview

Abstract:

The project progress control during equipment installation phase is a weak link in the whole construction process, and also the important and difficult part for supervision unit to implement the progress control. From the perspective of supervision unit, this paper analyzes the main factors affecting the progress control during equipment installation phase. Base on the analysis, some countermeasures and suggestions are put forward.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1734-1736

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gary P. Latham, Kenneth N. Wexley, Increasing Productivity Through Performance Appraisal, China Renmin University Press, Beijing, October, (2005).

Google Scholar

[2] L. Shu, Keith Hogg, G. David, The administration of international construction contracts in China: an evaluation of local consultants' abilities, in: Proceedings of 2nd CIB student Chapters International Symposium, Tsinghua, (2004).

Google Scholar