Water Diversion and Sediment Prevention of Head Complex of CCS Hydropower Station

Article Preview

Abstract:

Low dam of the head complex of CCS hydropower station results in its small capacity, in order to reduce the wear of turbines, higher requirement is demanded for the head complex design. Water diversion and sediment prevention system design together with general layout of the project, a forward flushing, flood discharging, lateral intaking system is formed. The basic purpose of reducing sediment diversion is reached by the comprehensive measures of interception, sedimentation, ejection, combined with reasonable reservoir operation scheduling system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

849-852

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] X. Yan, X. Liu, G. Li, Low Head Water Diversion and Sediment Prevention Hub, China Water Power Press, Beijing, (1990).

Google Scholar

[2] X. Yang, Y. Li, Design of Intake of Hydropower Station, Dalian University of Technology Press, Dalian, (1990).

Google Scholar

[3] F. Luo, Y. Xu, Z. Liang, Sediment prevention facilities of TianShengQiao grade-II hydropower station, Journal of Hydraulic Engineering, 11 (1991) 12-18.

Google Scholar

[4] R. Zhang, River Sediment Engineering, China Water Power Press, Beijing, (1980).

Google Scholar

[5] L. Ruan, H. Tian, Sediment prevention design of intake of Gaoqiao hydropower station, Water Resources and Hydraulic Engineering, Vols. 38 12 (2007) 91-94.

Google Scholar

[6] Y. Liang, J. Yang, J. Zhang, Design of Sedimentation Basin of Engineering of Water Resources and Hydraulic Power, China WaterPower Press, Beijing, (2004).

Google Scholar