Discussion and Analysis about Working Well of Tunnel Shield of Shanghai Tunnel Crossing River

Article Preview

Abstract:

Taking working well of tunnel crossing river for example, aimed at construction problem, the software of PLAXIS3D is used to simulate excavation, strut dismantling and water injecting. Several kinds of soil-reinforcing forms are also simulated to analyses the relation between soil-reinforcing form and retaining wall deformation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

959-963

Citation:

Online since:

October 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shanghai Second Municipal Engineering Company, Report of Changxing island working well construction monitor, (2007).

Google Scholar

[2] Shanghai Tunnel Engineering & Rail Transit Design and Research Institute, Design drawings of Changxing island working well, (2007).

Google Scholar

[3] J. Liu, X. Hou, Excavation Engineering Handbook, China Building Industry Press, Beijing, (1996).

Google Scholar