3-D FE Analysis on Loading Performance of Tunnel Under-Across Main Canal of South-to-North Water Transfer Project

Article Preview

Abstract:

Under the background of engineering application, a 3-D FE analysis was carried out to evaluate the loading performance of a two-hole pair-arch tunnel under-across the main canal of South-to-North Water Transfer Project. In fact, the tunnel was constructed in integral longitudinally without obeying the design requirement of parting within certain length. The analysis showed that the vertical deformation and tensile stress along the longitudinal axis are obviously affected by the loads from main canal, moreover, the tensile stress exceeds the limit of tensile strength of concrete, which may lead thoroughly cracks on top plate of tunnel. This analysis determined the crack zone which should be dealt with.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

991-995

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] SL 191-2008, Code for Design of Hydraulic Concrete Structures, China Water Power Press, Beijing, (2008).

Google Scholar

[2] DL 5077-1997, Specification for Load Design of Hydraulic Structures, China Water Power Press, Beijing, (1997).

Google Scholar

[3] JTG F60-2009, Specification for Construction Technology of Highway Tunnel, China Communication Press, Beijing, (2009).

Google Scholar