p.532
p.537
p.542
p.547
p.552
p.557
p.562
p.567
p.571
Production Planning Considering Transfer Lot Size
Abstract:
Traditional methods conduct production planning and scheduling separately and solve transfer lot sizing problem between these two steps. Unfortunately, this may result in infeasibility in planning and scheduling. We take into account transfer lot size in production planning to obtain the consistency and to eliminate the gap between planning and real production. We present the detailed Transfer Lot-Based Model with mixed integer programming. Experiments show that performance measures of a production plan change remarkably with increasing of transfer lot size.
Info:
Periodical:
Pages:
552-556
Citation:
Online since:
December 2010
Authors:
Keywords:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: