Production Planning Considering Transfer Lot Size

Article Preview

Abstract:

Traditional methods conduct production planning and scheduling separately and solve transfer lot sizing problem between these two steps. Unfortunately, this may result in infeasibility in planning and scheduling. We take into account transfer lot size in production planning to obtain the consistency and to eliminate the gap between planning and real production. We present the detailed Transfer Lot-Based Model with mixed integer programming. Experiments show that performance measures of a production plan change remarkably with increasing of transfer lot size.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

552-556

Citation:

Online since:

December 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Y. Iwata, K. Taji and H. Tamura: Production Planning & Control Vol. 14(2003), p.244–254.

Google Scholar

[2] K. Knutson, K. Kempf, J. Fowler, M. Carlyle: IIE Transactons Vol. 31(1999), pp.1103-1111.

DOI: 10.1023/a:1007635927265

Google Scholar

[3] C. -H. Lan and K. -C. Huang: The International Journal of Advanced Manufacturing Technology Vol. 29(2006), pp.1203-1211.

Google Scholar

[4] F. Van den broecke, H. Van Landeghem and E. -H. Aghezzaf: International Journal of Production Economics Vol. 112 (2008), pp.121-137.

DOI: 10.1016/j.ijpe.2006.08.029

Google Scholar

[5] W. Yan, J. Zhao and Z. Cao: Lecture Notes in Computer Science Vol. 3613 (2006), pp.285-294.

Google Scholar