Optimization Model and Algorithm for Smart Distribution Grid Maintenance Scheduling

Article Preview

Abstract:

According to the actual situation of maintenance scheduling for distribution network, with the development of smart distribution grid, a maintenance scheduling optimization model which aims at taking the minimum electricity quantity caused by maintenance interruption without violating any constraints is proposed in this paper. Considering the actual situation, the temporary maintenance application and the maintenance status of equipment (outage or charged) are proposed in the objective function. In terms of constraints, leading in emergency degree constraint makes it possible that the maintenance scheduling can be sequenced according to orders of priority, which conforms to the development of smart distribution grid better. Then by use of improved genetic algorithm the optimization problem is solved. The test results show that the proposed model and algorithm can effectively solve the maintenance scheduling optimization problem.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1457-1462

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Liu Yongmei, Sheng Wanxing. Optimization Model for Distribution Equipment Maintenance Scheduling Based on Network Topology and Genetic Algorithm. Power System Technology, 2007, 31 (21): 11-15.

Google Scholar

[2] Jiang Xianwei, Huang Minxiang, Xu Nuo, etc. Optimization of Transmission Equipment Maintenance Scheduling. Proceedings of the CSU-EPSA, 2007, 19(4): 116-120.

Google Scholar

[3] Huang Xianchao, Shu Juan, Zhang Lizi, etc. Distribution Maintenance Scheduling Using an Intelligent Optimal Approach Mixed with Immune Algorithm and Tabu Search. Proceedings of the CSEE, 2004, 24(11): 96-100.

Google Scholar

[4] Xu Xufeng, Huang Minxiang, Wang Tingting, etc. Optimization Algorithm of Power Supply Equipment Maintenance Scheduling and Its Application in Regional Power Network. Power System Technology, 2009. 33(14): 31-35.

Google Scholar

[5] Huang Xianchao, Shu Juan, Zhang Lizi, etc. Optimization Model for Distribution Maintenance Scheduling. Automation of Electric Power Systems, 2007, 31(1): 33-37.

Google Scholar

[6] Rana Mukerji,John H. Parker,Bruce W. Erickson. Power Plant Maintenance Scheduling: Optimizing Economics and Reliability. IEEE Transactions on Power System,1991,6(2): 476- 483.

DOI: 10.1109/59.76689

Google Scholar

[7] T. Sawa, T. Furukawa, M. Nomoto, etc. Automatic Scheduling Method Using Tabu Search for Maintenance Outage Tasks of Transmission and Substation System with Network Constraints. IEEE Transactions on Power Systems. 2000, 12(3): 47-55.

DOI: 10.1109/pesw.1999.747287

Google Scholar