A Study on Public Construction Project Duration Risk Identification and Evaluation

Article Preview

Abstract:

According to the Intricate Dynamic Relationship of the Duration Management System,the Paper Identified Risk Factors for the Object.Then Established a Comprehensive Integrated Public Construction Project Duration Risk Assessment Model with the Application of Game Theory-Based Weighting Method. the Model is Validated Effective and Reasonable through Simulation Analysis. and it also Provides a New way of Thinking in the Duration Risk Assessment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1593-1596

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] SU Yi, LI Baizhou. A study on system dynamics model of the large-scale enterprises'original innovation support system[J]. Studies in Science of Science2010, 28(1): 141-150.

Google Scholar

[2] WANG Jiayuan, SHEN Liyin, Hao, Xiaodong et al. Public Construction Project Schedule Delays Risk Research[J]. Journal of SHENZHEN University Science and Engineering2006, 23 (4): 303-307.

Google Scholar

[3] YIN Jian. A study on construction project management method and its application [D]. BEIJING: Beijing Jiaotong University2008.

Google Scholar

[4] HU Aijun,LI Ning,LI Chunhua et al. Essence and classification of risk in view of systematic dynamics[J]. Journal of Natural Disasters2008, 17(1): 39-43.

Google Scholar

[5] WU Yeke,SONG Rushun,CHEN Bo. A Comprehensive Weight Method Based on the Game Theory for Information Security Risk Assessment[J]. Computer Engineering&Science2011, 33 (5):9-13.

Google Scholar