The Force Analysis of Landing Stage and Transportation Terminal of Large Module with SPMT Trolley
Abstract:
Nickel ore project is the first main part construct project of modular and integrate large smelter. This project includes fifteen modules and its total weight is nearly forty thousand ton and the biggest module is five thousand ton. Use trolley to lade the nickel ore module. Use interim landing stage and shipboard method to land the nickel ore module because of the depth of water. Calculating the three operating modes in the lading process, design the landing stage construct. Thereby lay the foundation to lade the module safely and smoothly.
Info:
Periodical:
Pages:
349-353
Citation:
Online since:
December 2013
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved