The Force Analysis of Landing Stage and Transportation Terminal of Large Module with SPMT Trolley

Article Preview

Abstract:

Nickel ore project is the first main part construct project of modular and integrate large smelter. This project includes fifteen modules and its total weight is nearly forty thousand ton and the biggest module is five thousand ton. Use trolley to lade the nickel ore module. Use interim landing stage and shipboard method to land the nickel ore module because of the depth of water. Calculating the three operating modes in the lading process, design the landing stage construct. Thereby lay the foundation to lade the module safely and smoothly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

349-353

Citation:

Online since:

December 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XuBangzhen, JiangHua, Major cargo shiping stability calculation and adjustment, Journal of Dalian Maritime University, 2003, 29(1): 50~52.

Google Scholar

[2] WangYunhuang, Stability of small Angle the ship, World Shipping 1995(6): 55~56.

Google Scholar

[3] G.C. Leland, The Treatment of Ship Bilge, Ballast and Dock Rain-Water Run-off by An Electrox Process, Ocean Engineering, 1996, 19(8): 72~74.

DOI: 10.1109/oceans.1996.566721

Google Scholar

[4] LuQian, LiLianYou, LiLaiCheng, Ship principle manual, Beijing: National defence industry press, 1988,85~98.

Google Scholar

[5] GeShengYan, Discuss the oversize cargo shipping technology, China's science and technology review, 2009(19):113~114.

Google Scholar

[6] YuLianQing, MeiShun qi, DuLiZhen etc., ANSYS in the structure optimization design of the application, China Water Transport, 2007, 5(3), 76~77.

Google Scholar

[7] LeiJunJie, Large structure car shipping trestle analysis and adjustable load research, Tianjin university master's thesis, (2010).

Google Scholar