The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions

Article Preview

Abstract:

Reinforced concrete chimney lining initiation time should be slightly behind the outer wall. Adopting blasting scheme of preliminary demolition and big blasting cut is helpful to control the collapse of chimney and reduce the blasting vibration directions. Combined with a real blasting engineering, blasting demolition design of the reinforced concrete chimney under complex environmental condition was introduced.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

803-808

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] LIU Dian-zhong: A practical handbook for engineering blasting, edtied by Metallurgical Industry Press, Beijing, (1991), pp.531-532.

Google Scholar

[2] MO Ji-yun, ZHOU Yun-kui, JIN Mu, DUAN Wei-dong: Some Experience about Thick Wall Brick Chimney Blasting Demolition. Blasting, Vol. 29, No. 2, (2012) , pp.87-90.

Google Scholar

[3] WANG Xi-zhi, WU Jian-yuan, CHAI Jin-quan, YAN Jun: Blasting Demolition of Three 180 m High Reinforced Concrete Chimneys. Blasting, Vol. 29, No. 4, (2012) , pp.76-79.

Google Scholar

[4] YANG Zheng-ji, ZHANG Jian, HE Xian-qi: Demolition of Reinforced Concrete Chimney Group, by Directional Blasting. Engineering Blasting. Vol. 16, No. 2 (2010), pp.50-52.

Google Scholar

[5] CHEN De-zhi, D ING Bang-qin: Demolition of a 90m-high Reinforced Concrete Chimney by Directional Blasting. Blasting, Vol. 24, No. 4, (2007), pp.49-52.

Google Scholar

[6] HE Guang-yi, ZHU Zhong-jie: New technique of demolition blasting, edtied by China Railway Press, Beijing, (1988), pp.38-39.

Google Scholar

[7] LI Shou-ju: Safeguard technology in demolition blasting. Engineering Blasting. Vol. 1, No. 1 (1995), pp.71-75.

Google Scholar