Analysis of Separated Bridge for Lateral Connection

Article Preview

Abstract:

Use of cantilever plate and the fixed plate’s end moment formulas can obtain the value of the plate end moment which is increased, and then you can determine the reinforcement.Considered the differential settlement,an existing project is well solved, use the simple analysis to quickly identify the projects’ suitable means of connection.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

267-270

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Changhe Lu. GuangFo Expressway connecting the old and new test section of the bridge structure design [J]. Guangdong Highway, 2003 (4): 24 ~ 27. In Chinese.

Google Scholar

[2] Zhiguang Liang, Ping Wang, Jiachen Wang, ShenyouSong. GuangFo Expressway bridge structure connecting the old and new methods [J]. Bridges and Structures, 2006 (1): 30 ~ 34. In Chinese.

Google Scholar

[3] Chunsheng Ma, Shenyou Song. The design of Guangfo Houzhou Bridge connecting the old and new structures[J]. Highway, 2003, (8): 63 ~ 66. In Chinese.

Google Scholar

[4] Hongfei Sheng, Shuren Zhang, Lukuan Yuan. Transformation of the old and new bridge widening bond strength of reinforced concrete structures connected Study [J]. Chinese Journal of Highway, 1994, 7 (2): 52 ~ 58. In Chinese.

Google Scholar

[5] Jinsheng Du, Gang Zhao , Yongguo Zhao, Xiao-rong Hui. Old Bridge Widening deck deflection poor control [J]. Chang'an University (Natural Science Edition), 2011, 31 (4) : 58-62. In Chinese.

Google Scholar

[6] XianRu Zhao. Soft high embankment on the old road to broaden the whole process of settlement prediction [J]. Road Machinery & Construction Mechanization, 2009, 26 (9) : 40-42. In Chinese.

Google Scholar