The Modeling and Locating Technology of Assembly\Disassembly Tools in Virtual Environment

Article Preview

Abstract:

This paper presents a feasible approach for modeling and locating of assembly\disassembly tools in the virtual scene: First, a novel point-vector model for tool is presented by means of abstracting the locating constraints of tools; Then, the mapping relationship for locating constraints between tools and parts is detailed; Finally, the best matching constraints algorithm is proposed on basis of point-vector model, which can calculate the locating constraints to the triangle model of part in real time. The proposed method has been integrated in the virtual assembly system to solve practical assembly problems.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

229-233

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jayaram S, Jayaram U, Wang Y, et al. VADE: a virtual assembly design environment[J]. Computer Graphics and Applications, IEEE, 1999, 19(6): 44-50.

DOI: 10.1109/38.799739

Google Scholar

[2] Wu D, Zhen X, Fan X, et al. A virtual environment for complex products collaborative assembly operation simulation[J]. Journal of Intelligent Manufacturing, 2012, 23(3): 821-833.

DOI: 10.1007/s10845-010-0438-8

Google Scholar

[3] Chen G, Zhou J, Cai W, et al. A framework for an automotive body assembly process design system[J]. Computer-Aided Design, 2006, 38(5): 531-539.

DOI: 10.1016/j.cad.2006.01.012

Google Scholar

[4] Gomes de Sá A, Zachmann G. Virtual reality as a tool for verification of assembly and maintenance processes[J]. Computers & Graphics, 1999, 23(3): 389-403.

DOI: 10.1016/s0097-8493(99)00047-3

Google Scholar

[5] Hongmin Z, Dianliang W, Xiumin F. Interactive assembly tool planning based on assembly semantics in virtual environment[J]. The International Journal of Advanced Manufacturing Technology, 2010, 51(5-8): 739-755.

DOI: 10.1007/s00170-010-2630-6

Google Scholar

[6] Tran P, Grewal S. A data model for an assembly planning software system[J]. Computer Integrated Manufacturing Systems, 1997, 10(4): 267-275.

DOI: 10.1016/s0951-5240(97)00019-0

Google Scholar

[7] Lv H G, Lu C. An assembly sequence planning approach with a discrete particle swarm optimization algorithm[J]. The International Journal of Advanced Manufacturing Technology, 2010, 50(5-8): 761-770.

DOI: 10.1007/s00170-010-2519-4

Google Scholar

[8] Hsu Y Y, Tai P H, Wang M W, et al. A knowledge-based engineering system for assembly sequence planning[J]. The International Journal of Advanced Manufacturing Technology, 2011, 55(5-8): 763-782.

DOI: 10.1007/s00170-010-3093-5

Google Scholar

[9] Tseng Y J, Kao H T, Huang F Y. Integrated assembly and disassembly sequence planning using a GA approach[J]. International Journal of Production Research, 2010, 48(20): 5991-6013.

DOI: 10.1080/00207540903229173

Google Scholar