Effect of Small Radius on the Performance of Curved Steel Box Girder Bridge

Article Preview

Abstract:

According to the design of a three--span 38m+6om+38m bridge of cambered steel box beams, it is mainly presented that the construction methods of an urban viaduct of cambered steel box beams, its paved floor and treatment of shear lag effect., through the six series of 20 specimens calculation and analysis, simulation different local structures curved steel box girder bridges reflect more accurately the role of various factors in the mechanical behavior. This in-depth analysis of the different local structures in space curved steel box girder bridge performance, for guiding the engineering design has a certain reference value for further study curved steel linear and nonlinear mechanical properties and stability lay a good foundation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

727-730

Citation:

Online since:

January 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Sun Linlin. The steel - concrete composite box girder . Changsha: Central South University, (2009).

Google Scholar

[2] Qian Zhengdong, Luo Jian. The Orthotropic Steel Bridge Deck Pavement Stress Analysis . Journal of traffic and transportation engineering, 2004, 4 (2): 10-18.

Google Scholar

[3] Sun Xiaojie. The small radius curved beam bridge design (J). Traffic engineering and defense technology, 2009(2): 23-25.

Google Scholar

[4] Lou Tui Rong. Study and application of CWR. Beijing: China Railway Press, (2004).

Google Scholar