Real-Time Bidding Based on MooTools without Refreshing Page

Article Preview

Abstract:

The link of bidding is the key to large quantities of goods and materials purchasing of the railway. To meet the requirements of the procurement bidding, both sides are required to complete the process of bidding, consultation, and evaluation within the set time online synchronously. This paper introduces the real-time bidding based on MooTools without page refreshed.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2038-2041

Citation:

Online since:

January 2014

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yang Ge. Chengdu railway bureau management information system planning and implementation research [D]. Chengdu: Southwest university of finance and economics, 2005. In Chinese.

Google Scholar

[2] Zhang Ying. Tendering and bidding theory and the practice research in China [D]. Zhejiang university: management science and engineering, 2002. In Chinese.

Google Scholar

[3] Cao Ping. Probe into electric power material procurement management innovation [J]Economic and technology cooperation information, 2009, (34). In Chinese.

Google Scholar