Study on the Factory Prefabrication Technology of Large-Span Bridges Pier

Article Preview

Abstract:

The sea-crossing bridge construction takes orders the design idea of maximization, the factorization, the standardization and the assembly, which pile caps and pier shafts of the non-navigable span are prefabricated at the focus of prefabricated. In the paper, the precast solutions are put forward to pile caps and pier shafts of the non-navigable span, and the key technical problems of all kinds of precast solutions are analyzed. On this basis, the optimal pier factory prefabrication is proposed by the comparison of various schemes, which is carried out about advantages and disadvantages of prefabricated matching accuracy control, factory prefabrication, concrete placing, transport in the precast yard, transport style and the impact on follow-up construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1413-1417

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shen Yangyun. Key Techniques of Pier Precasting and Installing of Donghai Bridge[J]. Highway, 2005(8): 7~12.

Google Scholar

[2] Wang Guohua, Zhuang Zhengyi, Zhu Haojie. Construction Technique of Pier Integral Precasting during the 60 m In-navigable Section at the Sea [J]. China Municipal Engineering, 2007(3): 35~37.

Google Scholar

[3] Guan Quan. Construction for Prefabricated Pile Cap in Zhujiang Bridge[J]. Science Technology and Engineering, 2009(9): 5585~5588.

Google Scholar

[4] Ai Zongliang. Study on Construction Technology of Box Girder Segment's Stub Matching Precast and Cantilever Erection [D]. Southeast Unversity, (2006).

Google Scholar

[5] Zhang Yongming, Zhu lehui, Feng Bingsheng. Precasting and Installing Construction of In-water Pile Caps of Huangzhou Bridge[J]. World Bridges, 2004(3): 18~20.

Google Scholar