Application of Reflectorless Total Station in Bridge Detection and its Accuracy Analysis

Article Preview

Abstract:

In order to solve the problem of the linear measurement of arch ring for the detection of bridge,a new method is presented that measures the arch ring using a reflectorless total station on the side of the arch bridge and the detail operations are given. Taking account of weakness of edge suveying using a reflectorless total station,some formulas on the 3d coordinates calculation of the above and down edge of the arch ring based on the arch ring points are deduced.According to the law of error propagation, the accuracy of the X and Z axial coordinates are analysed.It is helpful for calculating lateral and vertical deformation and biridges elevation map that the transformation from free-station coordianates to the birdge axis coordinate by programming using EXCEL software is achieved.The method is used for bridges arch ring axial measurement in Qingcheng town,Yuzhong county,Gansu province,and its deformation is consistent with the measured results of the dial indicator,which satisfies the requirement of bridge detecton accuracy.So it is showed that the method is a good way of linear measuring of bridges arch ring.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1439-1444

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Cui Yuping. 2013. Concrete bridge detection and evaluation. Journal of highway 1, 113~119.

Google Scholar

[2] Chen Shunchao, Huang Pingming, Sun Shengjiang. 2011. A method of measuring the arch ring using a reflectorless total station and its accuracy analysis. Geotechnical Investigation & Surveying 7, 66~69.

Google Scholar

[3] Dong Hui, Li Liebiao, Liu Shijian, et al. 2006. Bridge monitoring data of the data mining model. Journal of computer applications 26, 100~101.

Google Scholar

[4] Pan Guobing, KeHongXia, Zhou Zuyuan, etc. 2012. Research on Application of Total-station InStrument without PriSm in Detection for Vertical Line Types of Bridge Arch Rings. Technology of Highway and Transport 4, 94~97.

Google Scholar

[5] Yu Jiayong,Zhu Jianjun, zou zhengrong. 2007. Research on the New Denection Measurement Method for Large Span Bridges. Journalof Hunan University(Natural Scicnces) 34(10): 31~34.

Google Scholar

[6] WANG Jing-wei, ZHOU Ya-fei, MENG Xiang-guo. 2011. Research on the 3D digital preservation of ancient buildings based on 3D GIS. JOURNAL OF SHANDONG JIANZHU UNIVERSITY 26(5): 178~181.

Google Scholar

[7] Cao Xuejuan, Yang Fanlin, Zhang Longping, etc. 2012. A two-dimensional coordinate conversion method fordifferent regions. Geotechnical Investigation & Surveying 12, 58~63.

Google Scholar