p.1657
p.1662
p.1668
p.1672
p.1678
p.1684
p.1688
p.1694
p.1701
Research on Nanning No.1 Subway Strata Combination Model and Regionalization
Abstract:
Analyzing and summing up the engineering geological and hydrogeological features of Nanning No.1 6 Subway, types strata combination model are put forward, which combing the first exploration data. Then the URT Line 1 is divided into 5 kinds engineering geology partition. At the same time, all engineering geology partitions engineering characteristic and engineering problem possibly appears are analyzed, drawing a conclusion that these first three types partitions shield tunnel may have more problem in the process of construction.
Info:
Periodical:
Pages:
1678-1683
Citation:
Online since:
January 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: