Study of Realizing Deep-Sea Erection Technology by Pioneering Dike

Article Preview

Abstract:

For deep-sea diking engineering, the water is deep, wave is high and stream is torrential in the erection stage, so the construction difficulty is very high. In this paper, the authors prove the feasibility of realizing the deep-sea erection by the pioneering dike from aspects of structure of the pioneering dike, construction equipments and operation procedures, etc., utilizing features of the pioneering dike, such as small body, flexible and fast construction, and capacity to fully utilize the conditions of falling tide.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1938-1941

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Dike Development Professional Committee of Chinese Hydraulic Engineering Society, Sea Reclamation Works of China [M]. Beijing: China Water Power Press. (2000).

Google Scholar

[2] The Writing Committee of Application Manual for Geosynthetics Engineering, Application Manual for Geosynthetics Engineering [M]. Beijing: China Architecture & Building Press. (2006).

Google Scholar