Numerical Optimization Analysis of the Construction Sequence of PBA Group Hole

Article Preview

Abstract:

Based on the PBA construction method of Changchun Liberation Road station metro line No.2, in order to get the optimization of construction sequence of six pilot tunnels, we use numerical simulation method and finite element software MIDAS GTS to establish the construction model of the station pilot tunnel. After comparing four excavation methods of the surface subsidence, we come to a conclusion that first up then down and first side then middle is the optimal excavation scheme. At the same time, we make models to analysis the necessity of making advance support before pilot tunnel construction. Pipe shed and small duct grouting pre support is very significant to the control of the subsidence of ground surface and vault.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2199-2204

Citation:

Online since:

January 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Junhua Yao, Wenjie Song, Jun Dong. Highway, 2013, (1) (In Chinese).

Google Scholar

[2] Jiyao Shi, Zhaowei Liu, Yongqiang Yu. Low Temperature Architecture Technology,2010, (2) (In Chinese).

Google Scholar

[3] Jiujiang Cui. Beijing: Science Press, 2005(In Chinese).

Google Scholar

[4] Yang Yuan, Weining Liu, Deyun Ding, Xincai Gao, Men Ma. Journal of underground space and engineering. 2011, 7(2) (In Chinese).

Google Scholar

[5] Wen Zhao, Dongyang Geng, Zhihui Dong, Yongwei Zhou. Journal of Shenyang architecture university, 2010, 26(5): 855-858(In Chinese).

Google Scholar

[6] Xiaolin Li.  Journal of underground space and engineering, 2007, 5 (3): 928-932(In Chinese).

Google Scholar