Formula of Unbonded Tendon Stress Increment Based Performance

Article Preview

Abstract:

Unbonded tendon stress calculation of unbonded precast concrete structure is defferent from prestressed concrete structure, as tendon strain caused by the external load is not in accordance with relevant sections of the concrete strain obtained. As the deformation of unbonded tendons are not subject to the deformation of plane-section assumption, therefore, arise due to external loads of unbonded tendon stress calculation is more complex. In this paper, based on theoretical analysis and derivation, the pre-stress deformation of the unbonded steel stress formula was given, this can provide more scientific basis for the stress Analysis of unbonded precast frame structure.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

815-818

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] DONG Ting-feng,LI Zhen-bao,ZHOU Xi-yuan et al.An experimental study on seismic performances of precast prestressed concrete beam-to-column connections with unbonded tendons[J]. Journal of Beijing University of Technology. 2006, 32(2): 144-148. (in Chinese).

Google Scholar

[2] HAN Jian-qiang, Li Zhen-bao. Assembly of New Connections Form Concrete Frame Structure[J]. Journal of Industrial Construction. 2009, 39(11): 100-103.

Google Scholar

[3] HAN Jian-qiang, Li Zhen-bao, Song Jia, Liu Chun-yang. Experimental study and finite element analysis on the seismic performance of prefabricated prestressed frame structure. Jianzhu Jiegou Xuebao/Journal of Building Structures. 2010(31): 311-314.

Google Scholar

[4] HAN Jian-qiang.experimental research on the seismic performance of unbonded precast concrete frame structure [D].Beijing University of Technology. 2011, 06.

Google Scholar

[5] LI Zhen-bao,DONG Ting-feng et al.Study on Seismic Performances of Hybrid Precast Concrete Beam-to-column Connections[J] . Journal of Beijing University of Technology.2006, 32(10):895-900. (in Chinese).

Google Scholar

[6] QIU Fa-wei,QIAN Jia-ru,CHEN Zhi-peng.Anti-seismic test method[M] . Beijing:Science Press, (2000).

Google Scholar