The Model and Algorithm of Using Shunting Locomotive for Marshalling Stations

Article Preview

Abstract:

The scheduling problem of shunting locomotive in marshalling station can be described as a single machine scheduling problem with distinct due window, the paper established the model of using shunting locomotive by taking the minimized the total number of tardy trains as targets. The paper proposed an adjustment method for train break-up and make-up sequence as a model algorithm, the model algorithm can be used to get the optimal train break-up sequence and make-up sequence. Based on the actual data of Fuyang North station, the paper used matlab program to realize the model algorithm, and got the optimal train break-up sequence and make-up sequence of Fuyang North station. The algorithm was proved feasible and effective.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1097-1101

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Shidong Wang et al., China Railway Science. 2007, 28(3): 104-109. In Chinese.

Google Scholar

[2] Shuo Wang et al., Railway Transport and Economy. 2011, 33(2): 83-87. In Chinese.

Google Scholar

[3] JieXu et al., Journal of Sichuan University of Science and Technology., 2003, 22(2): 1l-14. In Chinese.

Google Scholar

[4] JieXu et al., Journal of the China Railway Society. 2003, 25(3): 24-30. In Chinese.

Google Scholar

[5] Wenquan et al., Journal of Systems Engineering. 2000, 15(1): 38-43. In Chinese.

Google Scholar