The Underwater Project Management in 'Dong Fang' Offshore Oil Engineering

Article Preview

Abstract:

CNOOC laid offshore oil and natural gas pipelines for offshore drilling platforms. The engineering included laying the pipelines from offshore drilling platform to landing zone, laying the pipelines between two platforms, and installing vertical pipes for platforms. Aiming at the characteristics in the diving project management, this paper analyzes and evaluates the difficulties and risks of underwater work, puts forward the corresponding safety managements. These measures ensure the underwater operations safely and smoothly. The engineering lasts 195 days, uses 160 diving equipments, and dives 282 person-times. The total diving time is 17900 minutes, and the maximum diving depth is 70 meters.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

125-128

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Qi Junliang. Strengthen Diving Management to Ensure Safe Underwater Operation,. China Offshore Oil and Gas(Engineering), China, Vol03, (1994).

Google Scholar

[2] Zhao Dongyan, Application of Flexible Pipe in Bohai Submarine Pipelines, Doctoral Dissertation of Materials in physics and chemistry (professional), Shanghai metallurgical research institute of the Chinese academy of sciences, (2000).

Google Scholar

[3] LI Jingwu and LI Zhongling, Pipeline Landing Construction of Large Diameter Marine Pipeline, Doctoral Dissertation of Materials in physics and chemistry (professional), Shanghai metallurgical research institute of the Chinese academy of sciences, (2000).

Google Scholar