[1]
Pietro Canonaco, Pasquale Legato, Rina M. Mazza, et. al, A queuing net-work model for the management of berth crane operations,. Computers & Operations Research, vol35, 2008, pp: 2432-2446.
DOI: 10.1016/j.cor.2006.12.001
Google Scholar
[2]
Yusin Lee, Chuen-Yih Chen, An op-timization heuristic for the berth scheduling problem, European Jour-nal of Operational Research, vol196, 2009, pp: 500-508.
DOI: 10.1016/j.ejor.2008.03.021
Google Scholar
[3]
G. K. D. Saharidis , M. M. Golias, M. Boile, et. a, The berth scheduling problem with customer differentiation: a new methodological approach based on hierarchical optimization, Int J Adv Manuf Techno, vol46, 2010, pp: 377-393.
DOI: 10.1007/s00170-009-2068-x
Google Scholar
[4]
Yi Wang, Yun Chen, and Kesheng Wang, A Case Study of Genetic Al-gorithms for Quay Crane Scheduling, Opportunities and Challenges, vol214, 2009, pp: 119-125.
Google Scholar
[5]
R. Tavakkoli-Moghaddam, A. Maku, S. Salahi, et. al, An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports, Com-puters & Industrial Engineering, vol56, 2009, pp: 241-248.
DOI: 10.1016/j.cie.2008.05.011
Google Scholar
[6]
Frank Meisel, Christian Bierwirth, A unified approach for the evaluation of quay crane scheduling models and al-gorithms, Computers &Operations Research, vol38, 2011, pp: 683-693.
DOI: 10.1016/j.cor.2010.08.001
Google Scholar
[7]
Haipeng Zhang, Kap Hwan Kim, Maximizing the number of dual-cycle operations of quay cranes in container terminals, Computers & Industrial Engineering, vol56, 2009, pp: 979-992.
DOI: 10.1016/j.cie.2008.09.008
Google Scholar
[8]
Christian Bierwirth, Frank Meisel, A survey of berth allocation and quay crane scheduling problems in container terminals, European Journal of Operational Research, vol202, 2010, pp: 615-627.
DOI: 10.1016/j.ejor.2009.05.031
Google Scholar
[9]
Canrong Zhang, Li Zheng, Zhihai Zhang, et al, The allocation of berths and quay cranes by using a sub-gradient optimization technique, Computers & Industrial Engineering, vol58, 2010, pp: 40-50.
DOI: 10.1016/j.cie.2009.08.002
Google Scholar
[10]
Zhou Peng-fei, Kang Hai-gui, Study on Berth and Quay-crane Allocation under Stochastic Environments in Container Terminal, Systems Engineering - Theory & Practice, vol28, 2008, pp: 161-169.
DOI: 10.1016/s1874-8651(09)60001-6
Google Scholar
[11]
Miguel A. Salido, Mario Rodri-guez-Molins, Federico Barber, Integrated intelligent techniques for remarshaling and berthing in maritime terminals, Advanced Engineering Informatics, vol25, 2011, pp: 435–451.
DOI: 10.1016/j.aei.2010.10.001
Google Scholar
[12]
Chengji Liang, Jianquan Guo, Yang Yang, Multi-objective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning, J Intell Manuf, vol22, 2011, pp: 471-479.
DOI: 10.1007/s10845-009-0304-8
Google Scholar
[13]
Frank Meisel, Christian Bierwirth, Heuristics for the integration of crane productivity in the berth allocation problem, Transportation Research Part E, vol45, 2009, pp: 196-209.
DOI: 10.1016/j.tre.2008.03.001
Google Scholar
[14]
Xiao-le Han, Zhi-qiang Lu, Li-feng Xi, A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time, European Journal of Operational Research, vol207, 2010, pp: 1327-1340.
DOI: 10.1016/j.ejor.2010.07.018
Google Scholar