[1]
Gawiejnowicz, S.: Time-dependent scheduling. Springer, Berlin, (2008).
Google Scholar
[2]
Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5 (1979) 287-326.
DOI: 10.1016/s0167-5060(08)70356-x
Google Scholar
[3]
Lee, W. -C., Chung, Y. -H., Wu, C.C.: Scheduling deteriorating jobs on a single machine with release times. Computers and Industrial Engineering 54 (2008) 441-452.
DOI: 10.1016/j.cie.2007.08.006
Google Scholar
[4]
Mosheiov, G.: Scheduling jobs under simple linear deterioration. Computers and Operations Research 21 (1994) 653-659.
DOI: 10.1016/0305-0548(94)90080-9
Google Scholar
[5]
Potts, C.N., Van Wassenhove, L.N.: Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of the Operational Research Society 43 (1992)395-406.
DOI: 10.1057/jors.1992.66
Google Scholar
[6]
Wang, J. -B., Huang, X., Wu, Y. -B., Ji, P.: Group scheduling with independent setup times, ready times, and deteriorating job processing times. International Journal of Advanced Manufacturing Technology 60 (2012) 643-649.
DOI: 10.1007/s00170-011-3639-1
Google Scholar
[7]
Webster, S., Baker, K.R.: Scheduling groups of jobs on a single machine. Operations Research 43 (1995) 692-703.
DOI: 10.1287/opre.43.4.692
Google Scholar
[8]
Wu, C. -C., Shiau, Y. -R., Lee, W. -C.: Single-machine group scheduling problems with deterioration consideration. Computers and Operations Research 35 (2008) 1652-1659.
DOI: 10.1016/j.cor.2006.09.008
Google Scholar
[9]
Xu, Y. -T., Zhang, Y., Huang, X.: Single-machine ready times scheduling with group technology and proportional linear deterioration. Applied Mathematical Modelling, http: /dx. doi. org/10. 1016/j. apm. 2013. 05. 064.
DOI: 10.1016/j.apm.2013.05.064
Google Scholar