The Measurement System of Partial Discharge under Impulse Voltage

Article Preview

Abstract:

Partial discharge (PD) is the important detection parameter for power equipment, with the development of high voltage test technology, PD detection under impulse voltage is more attention. In order to detect the partial discharge signal under the impulse voltage, this paper designs a high-frequency current sensor and broadband measurement impedance. A set of partial discharge measurement system under impulse voltage is built up. The frequency characteristics of current sensor and measurement impedance are detected. In order to test the measurement system, the PD signals of a needle defect under impulse voltage is detected, the test results show that the PD measurement system can detect the PD signals effectively.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1046-1049

Citation:

Online since:

March 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Thione, L., Spinelli, A., bossi, A., Sesto, E., Sigaudi, G., Babare. IEEE Transactions on Power apparatus and systems, 1980, 2, 779-789.

DOI: 10.1109/tpas.1980.319673

Google Scholar

[2] IEC 60060-3 High Voltage Test Techniques Part 3: Definitions and Requirements for On-site Tests[S], (2005).

Google Scholar

[3] James H. Harlow. Electric power transformer engineering. Boca Raton, FL: CRC Press, (2004).

Google Scholar