[1]
Whitehouse, R., 1998. Scour at Marine Structures: A Manual for Practical Applications. Thomas Telford Publisher, ISBN: 0727726552.
Google Scholar
[2]
Sumer, B.M., Fredsøe, J., 2002. The Mechanics of Scour in the Marine Environment. World Scientific Publisher, ISBN: 9810249306, 552p.
Google Scholar
[3]
Gaythwaite, J., 2004. Design of Marine Facilities for the Berthing, Mooring, and Repair of Vessels. ASCE Publications, ISBN: 0784407266 531 pages.
DOI: 10.1061/9780784407264
Google Scholar
[4]
Hamill, G.A., Johnston, H.T., 1993. The decay of maximum velocity within the initial stages of a propeller wash. J. Hydraul. Res. 31 (5), 605–613.
DOI: 10.1080/00221689309498774
Google Scholar
[5]
Hamill, G.A., Stewart, D.P.J., Johnston, H.T., 1999. Propeller wash scour near to quay structures Journal of Waterway, Port, Coastal and Ocean Engineering. Am. Soc. Civ. Eng. 125 (4), 170–175, Jul/ Aug (1999).
DOI: 10.1061/(asce)0733-950x(1999)125:4(170)
Google Scholar
[6]
Lam, W., Hamill, G.A., Robinson, D.J., Raghunathan, S., 2010. Observations of the initial 3D flow from a ships propeller. Ocean Eng. 37, 1380–1388.
DOI: 10.1016/j.oceaneng.2010.07.008
Google Scholar
[7]
Lam, W., Hamill, G.A., Song, Y.C., Robinson, D.J., Raghunathan, S., 2011a. A review of the equations used to predict the velocity distribution within a ship's propeller jet. Ocean Eng. 38 (1), 1–10.
DOI: 10.1016/j.oceaneng.2010.10.016
Google Scholar
[8]
Lam, W., Song, Y.C., Raghunathan, S., Hamill, G.A., Robinson, D.J., 2011b. Investigation of a ship's propeller jet using momentum decay and energy decay. Can. J. Civ. Eng. 38, 605–615.
DOI: 10.1139/l11-028
Google Scholar
[9]
Lam, W., Hamill, G.A., Song, Y.C., Robinson, D.J., Raghunathan, S., 2011c. Experimental investigation of the decay from a ship s propeller. Chin. Oceanic Eng. 25, 265–284.
DOI: 10.1007/s13344-011-0022-9
Google Scholar
[10]
Lam, W.H., Hamill, G.A., Robinson, D.J., Raghunathan, S., 2012a. Semi-empirical methods for determining the efflux velocity from a ship's propeller. Appl. Ocean Res. 35, 14–24.
DOI: 10.1016/j.apor.2012.01.002
Google Scholar
[11]
Lam, W.H., Hamill, G.A., Robinson, D.J., Raghunathan, S., Song, Y.C., 2012b. Analysis of the 3D zone of flow establishment from a ship's propeller. KSCE J. Civil Eng. 16 (4), 465–477.
DOI: 10.1007/s12205-012-1256-7
Google Scholar
[12]
Lam, W.H., Robinson, D.J., Hamill, G.A., Zhao, J.F., Jia, M., 2012c. Time-averaged velocity and turbulence intensity at the initial downstream flow from a six bladed ship propeller. Ocean Eng. 51, 85–93.
DOI: 10.1016/j.oceaneng.2012.05.018
Google Scholar
[13]
Sciortino, J.A., 2010. Fishing harbour planning, construction and management. FAO Fisheries and Aquaculture Technical Paper. No. 539. Rome, FAO. 2010. 337p.
Google Scholar
[14]
Soon, C., Lam, W.H., 2013. The growth of seaports in Peninsular Malaysia and East Malaysia. Ocean and Coastal Management 78, 70-76.
DOI: 10.1016/j.ocecoaman.2013.03.007
Google Scholar
[15]
Maritime Safety Authority of New Zealand, 2004. Final guidelines of good practice for hydrographic surveys in New Zealand ports and harbours. Retrieved on 12. 06. 13, from, http: /www. maritimenz. govt. nz/Publications-and-forms/Commercial-operations/Ports-and harbours/Hydrographic-surveys-guidelines. pdf.
Google Scholar
[16]
International Hydrographic Oraganisation, 2005. Manual on Hydrography, 1st Edition May 2005. Retrieved 01. 06. 14, from http: /www. fig. net/commission4/iho/M-13_Chapter_3. pdf.
Google Scholar
[17]
International Hydrographic Organisation, 2008. IHO standards for hydrographic survey special publication No44, 5th Edition February 2008. Retrieved on 12. 06. 13, from. http: /www. iho. int/iho_pubs/standard/S-44_5E. pdf.
DOI: 10.1093/law:epil/9780199231690/e489
Google Scholar
[18]
Paramananthan, S., Zauyah, S., 1986. Soil landscape in Peninsular Malaysia. GEOSEA V Proceeding vol 1., Geol. Soc. Malaysia, Bulletin 19, April 1986, pp.565-583.
Google Scholar
[19]
Paramananthan, S., 2012. Keys to the identification of Malaysian soils using parent material. Second edition, March 2012. Published by Param Agricultural Soil Survey (M) Sdn. Bhd.
Google Scholar
[20]
Das, B.M., 2010. Principles of Geotechnical Engineering. 7th Edition (SI Edition). Published by United States of America: Cengage Learing.
Google Scholar
[21]
Penang Port, 2013. Retrived on 14. 01. 14. From, http: /www. penangport. com. my.
Google Scholar
[22]
Penang Port Sdn. Bhd., 2004. Penang harbour siltation study volume 1 draft final report, 2004. Seberang Perai Utara, Penang. Penang Port Sdn. Bhd.
DOI: 10.24252/teknosains.v14i1.12945
Google Scholar
[23]
Sutherland, B.R., Barrett K.J., Gingras, M.K., 2013. Clay settling in fresh and salt water. Retrieved from: http: /www. ualberta. ca/~bsuther/papers/claysettle/preprint. pdf.
Google Scholar