Study on Safety Monitoring and Forecasting of Qingping Tunnel Exit Based on Image Processing Technology

Article Preview

Abstract:

In order to ensure the construction safety and schedule of Qingping tunnel exit, the paper forecast the geological conditions and abnormal prediction of the two holes in front of Qingping tunnel exit by using TSP, then according to the geological detection image data, combined with geological data and working face surrounding rock geological reveal theinte-rpretation. The results show that, the rocks of the Qingping tunnel exit is crushed, more karst structure is development and part of the underground water is rich, where potential safety hazard as gushing and collapse exists in the construction, should take corresponding measures as soon as possible.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1139-1145

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yao Haibo etc: Advance Geological Forecast Report of Qingping Tunnel in Chongqing to Guang'an Express Way TJ-3 section (2013).

Google Scholar

[2] Wang Bo: Application of advance prediction technology in  tunnel construction of Cen water highway (2012).

Google Scholar

[3] Zhang Zongwei: Karst cave construction  of DK276+270 ~ DK276+205 section outlet in Yu mountain tunnel. The railway standard design (2003), pp.85-87.

Google Scholar