p.1153
p.1157
p.1161
p.1170
p.1177
p.1183
p.1190
p.1196
p.1200
Estimation of Overall Reliability for Zero-Failure Batch Production Monitoring Instrument Based on E-Bayes Method
Abstract:
To solve the problem of the overall reliability evaluation for the specific batch high-reliability monitoring instrument, for the practical problems for zero-failure data of the high-reliability instrument, we propose the batch production instrument overall reliability evaluation method based on E-Bayes theory, and give the point estimation and interval estimation of instrument overall reliability. Case study demonstrates the rationality and feasibility of the proposed method, which provides a reference for the dam safety monitoring management.
Info:
Periodical:
Pages:
1177-1182
Citation:
Online since:
July 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: