Analysis and Reinforcement on the Up-Floating Accident of the Basement of a Large Commercial Complex
Abstract:
This paper introduces the failure law of the floating structures by an engineering examples of the up-floating accident. The reasons of the accident are insufficience of anti-floating anchor rod, short of the length of anchor rod and early termination of precipitation, according to the analysis about the design and the construction information. Through the new anti-floating anchor and new reinforced concrete slab, the whole anti-uplift and partial anti-uplift of underground parts of the floating structure are strengthened. The frame columns and beams with cracking damage caused by the up-floating accident are strengthened with enlarging section method and the enclosure steel method.
Info:
Periodical:
Pages:
240-243
Citation:
Online since:
July 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: