Accident Treatment on Plinth Settlement of Monolayer Steel Factory
Abstract:
Crane and part of the column section of a monolayer industrial plant has a collision caused by uneven settlement of the foundation pillar. Based on the test on column bracket elevation, a overall uplift scheme for the basis of larger settlement has been proposed:truncate the middle column and stuff steel columns the same size as the original column section in the middle of column,then weld the column section and the truncated,upper and lower column groove. Flange plate and web plate are reinforced by steel plate and angle steel.Truncated steel columns can be lifted by down chain with a simple installation gantry, meanwhile control the displacement of uplift,preventing offset.