Crane and part of the column section of a monolayer industrial plant has a collision caused by uneven settlement of the foundation pillar. Based on the test on column bracket elevation, a overall uplift scheme for the basis of larger settlement has been proposed:truncate the middle column and stuff steel columns the same size as the original column section in the middle of column,then weld the column section and the truncated,upper and lower column groove. Flange plate and web plate are reinforced by steel plate and angle steel.Truncated steel columns can be lifted by down chain with a simple installation gantry, meanwhile control the displacement of uplift,preventing offset.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

309-312

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] GB50017-2003 code for design of steel structures [S] China Architecture& Building Press, Beijing, (2003).

Google Scholar

[2] GB50205-2001 code for acceptance of construction quality steel structure engineering [S] China Architecture & Building Press, Beijing, (2001).

Google Scholar

[3] Zhao Tingsheng, Wang Xi, Ma Qin, Design and construction on reinforced steel roof of a factory [J]. Building Structures 2009(04).

Google Scholar

[4] Zheng Zhencheng, Su Changji, Lin Peng, et al. Design calculations for reinforcement corrective measures of a single factory [C] Twelfth National Structural Engineering Conference Papers, Chong Qing, (2003).

Google Scholar

[5] Ding Sunwei. Research on seismic evaluation and strengthening of reinforced concrete single plant [D]. Shang Hai: Tongji University, (2008).

Google Scholar