Abstract:

Tunnel monthitoring reference value is an important indicator to determine the stability of surrounding rock. Existing tunnel specification vault settlement and surrounding convergence gives some guidance views, But in the actual project also found a number of problems, And no indication of surface displacement control reference value specification in. Based on the analysis of relevant norms, In practical engineering, for example, Monthitoring and Measurement standards for construction tunnel some meaningful discussion.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1127-1133

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Technical Specifications For Construction Of Highway Tunnel(JTG F60-2009).

Google Scholar

[2] Highway Tunnel Construction Technology Conditions(JTG/T F60-2009).

Google Scholar

[3] Specification for Design of Highway Tunnel (JTG D70-2004)(JTG D70-2004).

Google Scholar

[4] Technical Specification of Railway Tunnel Monthitoring Measurement (TB 10121-2007).

Google Scholar

[5] People's Republic Of China Ministry Of Railways. TB10108-2002 Railway Tunnel Construction Method Gunite Technical Specifications [S]. Beijing:China Railway Press, (2002).

Google Scholar

[6] National metallurgical industry bureau. GB50086-2001 Concrete Anchor Spray Supporting Technical Specifications [S]. Beijing: China planning press, (2001).

Google Scholar

[7] Xuan De YAO, Meng Su Wang. Statistical Analysis Of Shallow Tunneling Method Subway Construction Caused Surface Subsidence Control Standards [J]. Rock Mechanics And Engineering, 2006, 25(10): 2030-(2035).

Google Scholar

[8] Jiang Wen Li, Chun Zhi Liu, Quan Yong Zhu. Excavation Tunnel Under The Railway Station Benchmarking Study Of Surface Subsidence Control [J]. Rock And Soil Mechanics, 2005, 26(7): 1165-1169.

Google Scholar

[9] Rui Liang. Statistical Analysis And Prediction of Surface Subsidence Caused by Beijing Subway Tunnel Construction [D]. Beijing: Beijing Jiaotong University, (2007).

Google Scholar

[10] Li Ding Zhang, Jun Huang. Analysis And Prediction Of Vault subsidence value by Metro Tunnel Construction [J]. Rock Mechanics And Engineering, 2005, 24(10): 1073-1077.

Google Scholar

[11] Yu Jian Wang. Discussion On the Issues of Tunnel Project Monthitoring And Measurement [J]. Modern Tunnelling Technology, 2008, ( Supplement): 7-14.

Google Scholar