Outstripping Engineering Preparation of Construction Sites

Article Preview

Abstract:

The basic scheme of intensive implementation preparatory work, the general form of the formulas for determining the structure and amount of preparatory work performed prior to the start of construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2294-2298

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] P.P. Oleinik, Building organization. Conceptual bases. Models and methods. Information-systems engineering. M.: Profizdat (2001).

Google Scholar

[2] P.P. Oleinik, V.I. Brodsky Technique regulation of rates implementation the preparatory work: : submitted to Journal of Technology and organization of construction industry (2013).

Google Scholar

[3] I.G. Shepelyov, Mathematical methods and models of management in construction. M.: Graduate School, (1980).

Google Scholar

[4] V.A. Kharitonov, Underground buildings and structures on the industrial and civil values. M.: ASV, (2008).

Google Scholar