p.3175
p.3179
p.3183
p.3187
p.3192
p.3196
p.3204
p.3208
p.3215
Research on Tunnel Construction Quality Based on Visualization Management
Abstract:
Through the comprehensive application of modern information technology, network technology and modern construction management 4D theory has carried out the systematic study on the implementation method of the tunnel construction quality information rapid collection, visual management, centralized control and highly sharing. Based on the development of tunnel construction quality information management system, by logging data of design, construction, monitoring, supervision and test during the construction period, digital network management would be achieved in the tunnel construction process. mainly to complete: 1) combined with 3D models and tunnel construction schedule, build a tunnel 4D model; 2) Take additional tunnel construction quality management information for 4D theory to achieve dynamic visualization of construction quality management and query; 3) through practical engineering applications, the system is proved innovation in the tunnel construction quality management.
Info:
Periodical:
Pages:
3192-3195
Citation:
Online since:
July 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: