The Application of BP Artificial Neural Network in Geotechnical Engineering

Article Preview

Abstract:

Based on MATLAB, the article apply BP artificial neural network theory on the forecasting problem of time sequence in geotechnical engineering, and find it is an effecting way to solve the forecasting problem of time sequence in geotechnical engineering.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

823-826

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shengjun Zhang,Ye Xue, Jinan Tao. Prediction of Stable Displacement and Unstable Time on Tunnel and Slope[J], Chinese Journal of Geotechnical Engineering, 1996, 18(1): 39~45. (In Chinese).

Google Scholar

[2] Wei Gao. Discussion on "study on deformation behavior characteristics and modeling of slope system [J]. Chinese Journal of Geotechnical Engineering, 2002, 24(2): 260-. (In Chinese).

Google Scholar

[3] Xin Wen, Lu Zhou. Simulation and application of MATLAB neural network[M],Beijing: Science Press, 2003. (In Chinese).

Google Scholar

[4] Defeng Zhang. Simulation and application of MATLAB neural network[M],Beijing: Publishing House of Electronics Industry:2009. (In Chinese).

Google Scholar