Sleeve Valve Pipe and Steel Pipe Micropile Fractured Tensile Reinforcement in Combination with the Application of a Mined-Out Area
Abstract:
Due to the early years of mining makes Gob fracture zone, the deformation of rock fracture zone, and gradually developed through. Located in the mined-out area causing tension within fractured zone of discontinuous deformation region arsenal varying degrees of ground and walls to crack, great security risk to the normal operation of the arsenal caused. Project uses Sleeve Valve Pipe and Steel Pipe Micropile reinforcement scheme. This paper describes the details of the reinforcement mechanism, the construction process, technical requirements and quality assurance measures. Practice has proved that the joint reinforcement program can continue to crack the wall of effective governance to ensure the safe operation of the security arsenal.
Info:
Periodical:
Pages:
887-892
Citation:
Online since:
July 2014
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: