[1]
C.A. Gelogullari, R. Logendran, Group-scheduling problems in electronics manufacturing, Journal of Scheduling. 13 (2010) 177-202.
DOI: 10.1007/s10951-009-0147-3
Google Scholar
[2]
C. Barnhart, E. Johnson, G. Newhauser, M. Savelsbergh, P. Vance, Branch-and-price: column generation for solving huge integer programs, Operations Research. 46 (1998) 316-329.
DOI: 10.1287/opre.46.3.316
Google Scholar
[3]
W.E. Wilhelm, A technical review of column generation in integer programming, Optimization and Engineering. 2 (2001) 159-200.
Google Scholar
[4]
W.E. Wilhelm, P. Damodaran, J. Li, Prescribing the content and timing of product upgrades, IIE Transactions. 35 (2003) 647-664.
DOI: 10.1080/07408170304359
Google Scholar
[5]
F. Vanderbeck, On dantzig-wolfe decomposition in integer programming and ways to perform branching in a branch-and-price algorithm, Operations Research. 48 (2000) 111-128.
DOI: 10.1287/opre.48.1.111.12453
Google Scholar
[6]
C.A. Gelogullari, Group scheduling problems in electronics manufacturing (Doctoral dissertation), Oregon State University, Oregon, USA, (2005).
Google Scholar
[7]
J. Du, J.Y.T. Leung, Minimizing total tardiness on one machine is NP-hard, Mathematics of Operations Research. 15 (1999) 483-495.
DOI: 10.1287/moor.15.3.483
Google Scholar
[8]
M.T. Yazdani Sabouni, R. Logendran, An efficient branch-and-price approach for a dynamic PCB assembly, to be presented at the 23nd Annual Industrial and Systems Engineering Research Conference (ISERC), Montreal, Canada, May (2014).
Google Scholar
[9]
ILOG CPLEX, IBM, Version 12. 2. (2009).
Google Scholar