Introduction and Exploration of Qualification on Prototype Series of Nuclear Classified Heat Exchanger Tubes of RCC-M Specification

Article Preview

Abstract:

To ensure final product quality of nuclear classified heat exchanger tubes and satisfy requirement of batch process, RCC-M specification specify that prototype series qualification should be performed before manufacture. During qualification, manufacturing condition, technology process and technology parameters can be verified and solidified in order to establish manufacturing program. In the meantime,”defect catalogue” will be established by analyzing defects occurred in manufacturing. Finally, the aim of improving product quality and assure manufacturing process will be realized by qualification. How to perform qualification according to RCC-M specification with considering manufacturing process and test requirement of heat exchange tubes is also be presented in the article.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

401-405

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Design and construction rules for mechanical components of PWR nuclear islands RCC-M》[S], French association for design, construction and in-service inspection rules for nuclear island components(afcen): (2002).

DOI: 10.1016/0029-5493(91)90134-4

Google Scholar