Agricultural Machinery Resources Based on Time-Windows Model

Article Preview

Abstract:

To meet the scheduling demands of dispatching the agricultural machinery to the reasonable farmlands, time-windows based temporal and spatial scheduling model for agricultural machinery resources was built,which serialized decision-making processes and got optimal solutions for each process.The experiment results showed that the model could perform well in practice,which improved the management and working efficiency of the agricultural association.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2584-2586

Citation:

Online since:

September 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Li Jin, Zhang Jianghua, Zhu Daoli. Multi-resource emergency scheduling model and algorithm in disaster chain[J]. Systems Engineering-Theory & Practice, 2011, 31( 3) : 488 -495.

Google Scholar

[2] Ding Jianli, Li Xiaoli, Li Quanfu. Ant scheduling model for critical resources based on airport taxi[J]. Application Research of Computers, 2011, 28( 4) : 1 279 -1 281.

Google Scholar

[3] Foulds, L.R., Wilson, J.M., Scheduling operations for the harvesting of renewable resources, Journal of food engineering, 2005(70): 281-292.

DOI: 10.1016/j.jfoodeng.2003.12.009

Google Scholar

[4] Ahn, B. H., & Shin, J. Y. (1991). Vehicle-routing with time windows and time-varying congestion. Journal of Operational Research Society, 42(5), 393–400.

DOI: 10.1057/jors.1991.81

Google Scholar

[5] Geng Zefei, Hu Feihu, Chen Huimin, et al. On multiple disaster places emergency resource scheduling and ITS implementation [J]. Computer Applications and Software, 2010, 27( 2) : 63 ~66.

Google Scholar