Feasibility Study on Wind Power Distributed Grid Connection in Fuxin

Article Preview

Abstract:

The Distributed Generation can enhance the system power supply reliability and alleviate the pitch peak and restricted transmission capacity caused by large-scale wind power grid connection and other problems. In Fuxin, the system power supply is inadequate; the wind power integration is restricted and there are rich wind power reserves. Based on the current situation, this paper analyzes the necessity and feasibility of developing the distributed wind power in Fuxin and provides advisory opinions on the development sites and mode of wind power generation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3890-3893

Citation:

Online since:

September 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] DL 755-2001 Guidelines for Safety and Stability of Power System, (2001).

Google Scholar

[2] Liu Mingbo, Xie Min, Zhao Weixing, Large Power Grid Optimal Tide Calculation: Science Press, (2010).

Google Scholar

[3] Zhao Xinyi. New Energy Development Outlook [J]. Power Technology, 2009, 10.

Google Scholar

[4] Wei Dongyuan. Development Trend of Wind Power Industry in China [J]. Creative Technology, 2008, 9.

Google Scholar